Contact us

State Development Corporation of Thuringia (LEG Thüringen)

Dept. Investment, International Business and Cluster Promotion

Mainzerhofstraße 12
99084 Erfurt
Phone: +49 (0) 361 5603-450
Fax: +49 (0) 361 5603-328
write an email

| Invest in Thüringen

MDC Power set to expand

Daimler Group is extending MDC Power, its engine factory in Kölleda, at a cost of more than 200 million. The investment will make it possible to manufacture the next generation of low-emission four-cylinder diesel engines for Mercedes-Benz in Thuringia from 2015.

Two factory buildings, covering an area of 42.000 m² each, will be added to the production area to accommodate the future assembly activities, providing sufficient space for manufacturing the new Mercedes-Benz engines. “We’re really looking forward to having such large facilities here at MDC Power. Our staff are highly enthusiastic about assembling the new generation of four-cylinder diesel engines in Kölleda,” says Managing Director Dr Sven Breitschwerdt.

For Minister of Economic Affairs, Matthias Machnig, the planned extension is further confirmation of Thuringia’s appeal to investors: “When an international group like Daimler produces the key component of its premium vehicles in Thuringia, that really makes a statement about the location. This investment is a fresh reminder that Thuringia is a very attractive and competitive place to do business.” Construction of the new factory buildings will begin later this year. (kö)